Eric Guizzetti
Owner/Consultant
Portland | United States
Skills
No information
Industries
Skate
Snow
Surf
Trajectory
Apr 2020 — Now
Owner/Consultant · GTEC USA/Japan
Set up Business unit in the United States and Japan operating in coastal ports.
? Set up VDC processes including survey model alignment
? PC Set Up services for Large Data sets.
? Advanced Microsoft Sharepoint services for access and sites
? 3D Laser Scan Services including aligning to customers' models
?Photographed projects
?flew drones for imagery and video
Jan 2004 — Now
Photographer, Blogger · Knock Knock Japan
1. Photograph, edit and publish content on www.knockknockjapan.com
2. Measure and track the effectiveness of blog topics based on number of viewers and number of comments.
3. Perform continuous enhancements and modifications to the blog.
4. Troubleshoot and repair bugs and technical problems
5. As appropriate, respond promptly to blog comments and e-mail.
Feb 2019 — Apr 2020
Senior Reality Capture Engineer · DPR
? Laser Scan Tech specializing in Leica Geosystems Products
? In House Leica Trainer for DPR
? Laser Scanned and Managed BIM Process on $135M Pursuit of the PHX Mayo Clinic
? Worked in nearly every US Based office on Scan Projects
May 2017 — Feb 2019
Reality Capture Manager · Datum Tech Solutions
? Leica Sales, Services and Training
? Averaged two RTC360 Monthly for two years.
? Set up VDC processes including survey model alignment
? Managed Computer purchasing for company.
Nov 2013 — May 2017
Project Engineer · University of Southern California
? Managed everything related to BIM, VDC, Project Files, documents, and processes.
? Created Bluebeam Dashboard for use by Internal team, General Contractor, Subcontractors, and Consultants. The USC Village Bluebeam Project is currently the largest ever created at 60 Gigs.
? Managed internal communication between departments within USC related to the project.
? Project Manager for ATSAC replacement.
Feb 2013 — Apr 2014
Senior Project Engineer · Mike Rovner Construction, Inc
This project consists of converting an AMC 16 into 69 units of loft style apartments, single and two story. The AMC is situated in a mixed use complex in Downtown Long Beach. The theater is sandwiched between 3 floors of parking below and 3 floors of apartments above equaling 226 units in capacity. The structure for the AMC was originally design built as a movie theater with structural metal, metal pan decking and 6” of concrete. The structure itself was a challenge due to the sloping floors, elevation changes and low ceiling heights. My job consists of Maintaining meeting minutes, writing/logging RFI’s, writing/logging change orders, writing/logging submittals, writing/maintaining schedule, specification conformance, construction planning, redlining and planning/permitting.
Apr 2012 — Feb 2013
Project Manager · Abilene Inc
Plan, direct, coordinate, budget, and implement boiler installations.
May 2009 — Apr 2012
Project Manager- Construction · Urban Homesteading Assistance Board
Plan, direct, coordinate, and budget projects, manage subordinate supervisory personnel, activities concerned with the construction and maintenance of structures, facilities, and weatherization systems. Participate in the conceptual development of a construction projects and oversee its organization, budgeting, scheduling, engineering specifications and drawing through implementation.
May 2008 — May 2009
Multi Family Construction Manager · Hanac Weatherization
Multiple Jobsites in Astoria/Queens
PROJECT TYPE: Construction/ Weatherization
Dollar Value: $10,000- $500,000
Brief Description of Project: Plan, direct, coordinate, and budget projects, manager subordinate supervisory personnel, activities concerned with the construction and maintenance of structures, facilities, and weatherization systems. Participate in the conceptual development of a construction weatherization projects and oversee its organization, scheduling, and implementation.
Mar 2006 — May 2008
Systems Engineer-CQC Assistant · Garco Building Systems
98315
PROJECT TYPE: Construction
Dollar Value: $19,000,000.00
Brief Description of Project: The project consists of constructing a; The building is constructed of Steel and CMU exterior walls with an overlay of CMU Veneer and Metal Wall Panels. There are 18,000 sq feet of assembly area and 16,000 sq feet of shop and office area all covered by a membrane barrel roof. The project has stringent facilities evaluation and testing requirements with strict compliance to codes, LEED guidelines and contract specifications. Job responsibilities include: reviewing all materials submittals for compliance and submitting them to the Navy, tracking submittal register and the requests for information, making weekly storm water inspection and keeping the SWPPP updated, field inspections to insure work is in contract compliance, implements the three phase quality control program, and conducts the weekly QC meetings.
Feb 2006 — Mar 2007
Project Engineer · McClure and Sons
PROJECT TYPE: Construction
Dollar Value: $28,000,000
Brief Description of Project: The project consists of retrofitting the existing Waste Water Treatment Plant and adding a Bioreactor to boost capacity of the plant to 1,000,000 gallons of water cleaned per day. The City of Winlock has expanded its capacity by adding eight Membrane Bioreactor Cells on the upper hill above the existing plant. The new Reactor is construction of Concrete with CMU Pump house and stands 40' above grade and has a footprint of nearly 12,000 sq feet. There is also a new Generator and tool storage shed on the new upper facility. The lower facility consists of retrofitting the existing equipment and office area's to the new facility. Job responsibilities include: reviewing all materials submittals for compliance and submitting to the Architect, tracking submittal register, procurement log and the requests for information. Assisted with all Safety and acted as the alternate Superintendent.
Feb 2004 — Mar 2006
General Superintendent · Employing Firm: CityWide Electric
Managed day to day operations for the greater San Diego area. Walked jobs for specification conformance and attending job sites meetings. Red-lined drawings for fire alarm systems, sprinkler monitoring systems, a variety of security systems for home and business, vacuum systems, television, data and phone pre wiring, surround sound & intercom systems, nurse call systems & closed circuit systems. Job-sites varied in size from as small as a single family residence to shopping malls, high rise apartments and office buildings.
Jan 2001 — Jan 2004
Project Manager · McGuire Electric
Assorted Jobsites
PROJECT TYPE: Construction
Dollar Value: Range from $60,000- $5,000,000
Brief Description of Project: New Construction projects consisting of high rise commercial mixed use fire alarm, security and telephone systems. Duties included; managing man power needs of jobsites, randomly selecting jobsites for conformance to contract inspections, scheduling, budgeting, ordering materials, personnel training, and attending coordination meetings.
Activity
Education history
AEA Energy Management Training Center
Energy Auditor | 2008 - 2008
AEA Energy Management Training Center
Energy Auditor | 2008 - 2008
AGC
CQM | 2007 - 2008
AGC
CECSL | 2006 - 2006
AGC
P3-101 | 2006 - 2006
AGC
CQM | 2007 - 2008
AGC
CECSL | 2006 - 2006
AGC
P3-101 | 2006 - 2006
Assocation for Energy Affodability
Clean Boilers | 2009 - 2009
Assocation for Energy Affodability
Clean Boilers | 2009 - 2009
NYU
Autocad Certification | 2011 - 2012
NYU
Autocad Certification | 2011 - 2012
Olympic College
SBA | 2006 - 2007
Olympic College
SBA | 2006 - 2007




